Nacelle Assembly

C&F Green Energy’s aesthetical pleasing nacelle, at the head of the mast, houses the generator, transformer and electronics.

The internal layout of the nacelle has been carefully considered to provide ample room to perform routine maintenance.

The nose cone has been specifically designed to allow for ease of access to the rotor and blade roots without the need to go through the nacelle.

At full capacity the smaller turbine production line can yield 20 11kW to 25kW units a week whilst the larger turbine production line can yield 4 50kW to 100kW units a week.